
Rezé2025
Roof renewed, dormer restored
A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
Interlocking clay tiles12 days
One call, a roofer on the line, a tarp on your roof within 24 hours in our area. Then a repair quote and the photos your insurer will ask for.
What to do right now
Cut the power in the wet room if water reaches a light or a socket.
Move furniture, put down buckets and towels, never climb onto the roof.
Photograph the damage inside and out: the insurer will ask for it.

22 yrs
on roofs
Who climbs onto your roof
After every storm, people knock on doors offering to fix roofs on the spot. Here is who we are, and what covers you if anything goes wrong.
Ten-year insurance
The certificate comes with every quote.
RGE certified
The condition for insulation grants.
Safety before climbing
Scaffolding or guardrails in place before the first tile comes off.
Site left clean
Old tiles and offcuts taken away, gutters emptied.
What we do
Starting prices, so you know before you call.
Storm call-outTiles blown off, a branch through the roof: we make it watertight the same day and document everything for your insurer.
from €290
Storm call-outA stain on the ceiling rarely sits under the leak. We find where the water really gets in, then repair only what needs repairing.
from €180
Clay tiles, battens and underlay renewed, the rafters checked on the way: a roof done for the next fifty years.
from €120 per m²
Natural slate, hooked or nailed, laid by hand: the roof of the region, for the life of the house.
from €160 per m²
Gutters, downpipes, flashings and ridge in zinc, shaped and soldered on site to fit your roof.
from €55 per metre
Moss removed by hand and a treatment applied, only when the roof needs it. We tell you when it does not.
from €18 per m²Recent jobs
Roofs we repaired or renewed after the call.

Rezé2025
A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
Interlocking clay tiles12 days

Orvault2025
A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.
Natural slate, hooked4 weeks

Nantes2024
A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.
Natural zinc9 days

Carquefou2025
A dark loft turned into two bedrooms, three windows cut into the tiled slope.
Roof windows and flashing kits3 days

Vertou2024
Rotten rafters found when stripping the roof, replaced before the new covering went on.
Treated softwood6 days

Saint-Sébastien-sur-Loire2024
Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.
Reclaimed canal tiles8 days
From the first call to the handover
A roofer answers and tells you whether it can wait until tomorrow.
Tarp fastened and weighted, loose tiles removed before they fall on the street.
Dated photos, a written report and the repair quote, for your insurance claim.
Once the insurer has agreed, the repair is booked and the tarp comes off.
Good to know
Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.
It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.
We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.
For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.
A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.
Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.
Where we tarp within 24 or 48 hours after a call.
Carquefou
44470
within 48 h
La Chapelle-sur-Erdre
44240
within 48 h
Nantes
44000
within 24 h
Orvault
44700
within 48 h
Rezé
44400
within 24 h
Saint-Herblain
44800
within 24 h
Saint-Sébastien-sur-Loire
44230
within 24 h
Vertou
44120
within 48 h
Once the scaffolding came down
"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Sandrine L.
Storm tarping, Rezé
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
Gérard M.
Leak repair, Orvault
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
Claire and Julien V.
Slate roof renewal, Carquefou
Four fields, thirty seconds. If you can, add a photo by text message once we call.
Water coming in right now? Do not fill anything in, call01 23 45 67 89